The technical foundation of this micro hydroelectric power plant is a miniature Kaplan turbine. The rather interesting architectural form of this plant was prepared in cooperation with the local government, who required a clock powerhouse covered with COR-TEN, weathering steel, to fit in with the industrial nature of the town.
weir → power house → outlet channel 10 m → river Serio → power line 0.1 km 35 kV