Jonouli 2

  • Country: Georgia
  • Rated power: 35 MW new power plant
  • Investment cost: 50,000,000 $
  • Our service: design
  • Gross head: 550 m
  • Rated flow: 8 m3/s
  • Technology: 2 x Pelton turbine horizontal
  • Client: GEEN Development

Project overview

This project was in fact an extension of an existing small power plant named Jonouli 1 (also designed by Stream). Jonouli 2 is located downstream from the Babushkino lake on the Jonouli river, in a very attractive tourist area near the town of Tsageri in Georgia. The construction is planned to take place between 2019 – 2020.

Scheme

weir → sand trap → penstock (GRP/steel) 8 km→ power house → outlet channel 100 m → river Jonouli → power line 15 km 110 kV