This project was in fact an extension of an existing small power plant named Jonouli 1 (also designed by Stream). Jonouli 2 is located downstream from the Babushkino lake on the Jonouli river, in a very attractive tourist area near the town of Tsageri in Georgia. The construction is planned to take place between 2019 – 2020.
weir → sand trap → penstock (GRP/steel) 8 km→ power house → outlet channel 100 m → river Jonouli → power line 15 km 110 kV